Offsite structures for schools, built around the term calendar.
Classrooms, rooftop extensions and nurseries in timber frame or SIPs, installed on live school sites with the evidence building control asks for.
Fast, fabric-first and quiet on a live site.
Education projects run to fixed windows and occupied sites. We plan the structure around both: manufacture runs while the site is prepared, and installation is sequenced to keep disruption to a minimum.
- Term-time programmes: manufacture scheduled so the install lands in the holiday window.
- Live sites: logistics, lifting and exclusion zones planned before anything arrives.
- Performance: fabric-first envelopes up to Passivhaus-level performance.
- Low carbon: timber-led structures, with large open spans and no structural steel where the design allows.
- Evidence: fire, acoustic, thermal and structural evidence organised for your design team and building control.
Repeat education work, delivered on live sites.
Sixth Form Centre
Six contemporary classrooms delivered in the heart of a live school environment.
STEM Rooftop Department
A fabric-first rooftop extension with large spans and a complex installation.
Design & Technology Studio
Low-carbon timber-engineered building delivered to a tight timescale.
BREEAM Nursery
Eco early years extension designed, manufactured and installed for the summer holiday period.
Eco Nursery Extension
Low energy nursery delivered on a live school site with minimal disruption.
Frequently asked questions.
Can you work around the school year?
Yes. Design and manufacture are scheduled back from the window you have, so the structure is installed when the site is free.
Do you work for main contractors?
Yes. We deliver the structure package as a specialist subcontractor, from design through to weathertight.
Which system is best for a school building?
It depends on spans, performance targets and the site. We compare SIPs and timber frame routes and recommend the one that suits the project.
Planning an education project?
Send us your drawings or brief and we will come back with the right structure route, the key compliance questions and an indicative price.