Built where the standard way didn't work.
Live schools, rooftops, woodland sites with no road in. SIPs and timber frame structures, engineered, supplied and installed.
Proof that we deliver.
STEM Rooftop Department
Fabric-first rooftop extension delivered on a live school site. Stunning spans and complex installation.
Ultra Low Energy Home
Modern bungalow reborn as a fabric-first family home with habitable roof space, delivered around site constraints.
Energy Positive Home
Ultra low energy home, thermally modelled to exacting levels. Award-winning eco home design.
Design & Technology Studio
Low-carbon timber-engineered building with large open spans, delivered to a tight timescale.
Luxury Barn
Meeting precision design parameters and high-performance targets on a constrained site to deliver a luxury barn rebuild.
Heritage Styled Eco Homes
Highly insulated homes, precision manufactured to meet planning requirements and delivered on a constrained, compact site.
Sixth Form Centre
Six contemporary classrooms at Passivhaus level performance, delivered in the heart of a live school environment.
Luxury Golf Simulator & Recreation
Lounge, bar, wine room and golf simulator in one woodland retreat.
BREEAM Nursery
Eco Early Years extension designed, manufactured and installed to meet the summer holiday period.
Eco Nursery Extension
Low energy nursery delivered to a live school site with minimal disruption and a crane-free design.
Rural Eco Home
SIPs roof married to ICF walls, delivered on a challenging hillside location.
Ultra Low Energy Bungalow
Passivhaus-principles bungalow delivered on a compact site on a tight private road.
Modern Home
Three-storey contemporary home engineered for exceptional comfort and efficiency on a compact plot.
Thatched Heritage Home
Fast-track, high-performance structure meeting the complex requirements of a thatched roof.
Accessible Living Extension
Fast-track, high-performance structure meeting complex accessibility and performance requirements.
We researched timber frame before selecting Dynamic as our partner. Dynamic supplied and installed our frames in 10 days, then supported our team to achieve completed shells prior to significant flooding in the surrounding areas.
Developer, Woodlands · Timber frame · ShropshireWhat we're building next.
Visuals shown.


