Developers · Housing Associations · Schemes

Offsite structures for developers and housing schemes.

Timber frame and SIPs at scale — one accountable partner, committed programmes.

For Developers & Housing Associations

Offsite structures at scheme scale, from one accountable partner.

Timber frame and SIPs for housing developments: engineered, manufactured and installed to committed plot programmes, with the MMC categorisation, PMV and compliance evidence funded schemes demand.

  • Programme economics: earlier weathertight, earlier completions, less finance carried.
  • MMC Category 2: panelised systems with PMV evidence for Homes England-funded schemes.
  • One partner: design, engineering, supply, logistics and install — no handoffs between plots.
  • Warranty-ready: NHBC and major providers, evidence organised before manufacture.
  • Track record: residential, education and commercial delivery nationwide.

Have drawings? Reply to our email with them attached, or use Start a Project to upload now.

Scheme Delivery

Plots to a rhythm your programme can bank on.

Manufacture scheduled to your assembly sequence; logistics and lifting owned by us. The join between offsite and site is where schemes slip — so we own it. Read how the MMC categories and PMV affect your funding position.

Install crew erecting panels on a housing scheme
How We Deliver

Design. Engineer. Supply. Logistics. Install.

Design
Engineer
Supply
Logistics
Install
Questions We Get Asked

Frequently asked questions.

What MMC category are your systems?

Panelised SIPs and timber frame sit in MMC Category 2. We provide the categorisation and PMV evidence funded schemes require — see our MMC categories guide.

Can you deliver multi-plot programmes?

Yes — manufacture is scheduled to your assembly sequence, with logistics, cranes and lifting managed by us, so plots reach weathertight in a rhythm your trades can follow.

How does offsite improve development economics?

Earlier weathertight means earlier first fix, earlier completions and less finance cost carried. Typical programmes save weeks per plot against masonry.

Are your systems mortgageable and warrantable?

Yes — certified systems accepted by NHBC and major warranty providers, with the evidence pack prepared for building control and lenders.

Book a scheme review.

Send us your scheme drawings and we will come back with an honest system recommendation, programme view and fixed price. No hard sell.