Compliance-Ready

Selected for performance. Evidenced for compliance.

The technical pack, organised before manufacture.

Evidence Before Manufacture

Visible while it can still shape the package.

We deliver the insulated structure package with the evidence for the levels of compliance required on your project, and make it visible before manufacture, when it can still shape the package.

The Technical Pack

Evidence and responsibilities, organised around your package.

For each project we co-ordinate the evidence route across the disciplines that decide whether a structure package is buildable and approvable:

  • Structural: load paths, interfaces, tolerances and connection logic.
  • Thermal & airtightness: U-values, junction detailing, thermal modelling and test support.
  • Fire: evidence route, assumptions and responsibilities for the structure package.
  • Acoustic: separating and interface performance, evidence and ownership.
  • Warranty & building control: the accreditation and evidence route.
  • QA & handover: on-site QA audit and defect-free weathertight handover record.
Structure package on site with load paths and interfaces resolved
QA audit and sign-off at weathertight handover
Why It Matters: Cost of Leaving It Late

Structural, thermal, fire and acoustic assumptions left unresolved until the project hits site are typically significantly harder to change.

Bringing the evidence forward is how the risk is designed out. Compliance-ready does not mean over-promising. It means the relevant evidence, detailing and responsibilities are visible before manufacture.

Performance Data

SIPs and timber frame U-values, published.

Certified thermal performance for the panel ranges we supply and install. Build-up dimensions and full datasheets on request.

SIP panels

Panel thicknessU-value (W/m²K)
150mm0.18
175mm0.15
200mm0.13
225mm0.12

Timber frame

Build-upU-value (W/m²K)
Standard0.18
Enhanced0.15
High performance0.12

Dimensions on request — specified to your target.

Choosing a system?

Side-by-side comparisons written by the team that delivers both:

SIPs vs timber frame

Open vs closed panel

MMC categories & PMV

Get the evidence route mapped before manufacture.