Timber frame supply and install, UK-wide.
Open and closed-panel systems, erected by our own teams to a committed date.
Timber frame manufacturers hand over panels. We hand over a weathertight building.
Timber frame supply and install as one accountable package: open and closed-panel systems engineered by our team, manufactured by accredited partners, erected by our own CSCS / SSSTS / CPCS qualified crews to a committed date.
- Open & closed panel: specified to the project, not our stock.
- U-values to 0.12 W/m²K: Eco to Passivhaus, evidenced.
- In-house erect teams: no third-party crews who never saw the design.
- Programme certainty: weathertight date committed across the package.
- NHBC & warranty accepted: certified systems, compliance-ready evidence.
From single homes to education schemes.
Open and closed-panel structures delivered across residential, education and commercial projects — see our track record.
Design. Engineer. Supply. Logistics. Install.
Frequently asked questions.
How much does timber frame supply and install cost?
A structural package (design, supply and erect) typically represents 15–20% of total build cost, with open panel the most cost-effective route. Send drawings for a fixed price.
Open panel or closed panel — which should I choose?
Open panel keeps package cost down; closed panel moves more work into the factory for higher PMV, tighter quality control and a faster programme. We deliver both and specify what the project justifies — see our full comparison.
Do you erect frames supplied by other manufacturers?
Our model is the integrated route — design, supply and install as one accountable package. That is how we commit to weathertight dates.
How fast is a timber frame erect?
Shells reach weathertight in days rather than months, typically saving weeks against masonry across the whole programme.
Get a clear timber frame quote for your project.
Send us your drawings or brief and we will come back with a straight answer on route, price and programme. No hard sell.